From permits to construction, WSSI worked with a northeast U.S. utility to replace corrugated metal pipe culverts in rural areas with federally protected waters

The Challenge

A northeast U.S. utility has power lines throughout Maryland, including rights-of-way located in rural areas that require access roads. The access roads that are built over streams and other environmentally-sensitive areas use culverts to avoid disrupting the natural ecosystem and impacting federally protected waters. Culverts made of corrugated metal pipe (CMP) can become damaged over time, compromising the flow of water, which in turn compromises the stream’s health.

When the utility noticed their CMP culverts were becoming damaged in June 2019, they called on their existing relationship with Wetland Studies and Solutions, Inc. (WSSI), a Davey company, to put together a plan that would take into consideration the complex permitting requirements needed to replace them.

The Solution

The utility gave WSSI a list of five culverts in Anne Arundel County, MD to replace. Starting with delineation, WSSI provided a soup-to-nuts solution that included permit approval and construction.

WSSI excavated the old pipe using a track hoe and replaced it with a high-density polyethylene (HDPE) culvert. HDPE culverts are less prone to rusting than CMP and have a longer lifespan.

The Results

WSSI completed the replacement project, from permitting to construction, in 6 months.

The utility was impressed with WSSI’s quick turnaround time and ability to complete the project under budget. WSSI is currently in the beginning stages of replacing more culverts for the utility in Baltimore County, MD.

>> Contact us to learn more about Davey's Utility Solutions.

Related Client Work

2000 Days Part 2 Terrain Photo 2
Electric Investor-Owned Utility

Safety-Focused Crews Surpass 2,000 Incident-Free Days

A line clearance crew working in Tennessee and Virginia passed 2,000 days without an OSHA recordable incident while working on rough terrain.
Read More
DSC 2151
Electric Investor-Owned Utility

Davey Makes Quick Work of Natural Gas Farm Tap Inspection

Davey helped a natural gas utility complete an inspection and leak detection project for farm taps located in rural areas of Northeast and Northwest Ohio, finishing before the scheduled timeline and within financial goals.
Read More

Get In Touch With Us!

We pride ourselves at Davey Tree on providing prompt, professional and personalized service from certified arborists that live, work and engage in your community. Contact one of our Davey Tree specialists for your residential, commercial, utility, or environmental needs.

Let's Find What
You're Looking For!

Davey uses cookies to make your experience a great one by providing us analytics so we can offer you the most relevant content. By continuing to use this site, you accept our use of cookies. View our Privacy Policy for more information.