Davey uses cookies to make your experience a great one by providing us analytics so we can offer you the most relevant content. By continuing to use this site, you accept our use of cookies. View our Privacy Policy for more information.

DRG Environmental Consulting Project Profiles

Browse More Environmental Consulting Project Profiles

  • WETLAND CONSTRUCTION, PRINCE WILLIAM AND FAUQUIER COUNTIES, VA
    WETLAND CONSTRUCTION, PRINCE WILLIAM AND FAUQUIER COUNTIES, VA

    Wetland Studies and Solutions, Inc. created, restored, and enhanced 375 acres of wetlands, 3.5 acres of open water, 81 acres of preserved wetlands, and 216 acres of preserved or reforested upland buffers along the Cedar Run in Virginia.

  • TREE INVENTORY AND MANAGEMENT PLAN FOR NEW HIGH SCHOOL, KIRKLAND, WA
    TREE INVENTORY AND MANAGEMENT PLAN FOR NEW HIGH SCHOOL, KIRKLAND, WA

    DRG completed an inventory and management plan to identify priority tree care concerns for the property of a newly constructed high school in Kirkland, WA.

  • RESISTANCE DRILLING TREE INSPECTION, KENT, WA
    RESISTANCE DRILLING TREE INSPECTION, KENT, WA

    DRG provided a resistance drilling inspection to determine the overall health of an at-risk tree in Kent, WA.

  • WEST FORK NATURAL STREAMBANK REPAIR, BATH TOWNSHIP, OH
    WEST FORK NATURAL STREAMBANK REPAIR, BATH TOWNSHIP, OH

    Severe erosion of 125 feet of streambank in Bath Township, OH was threatening an adjacent stormwater management basin. DRG used bioengineering methods to stabilize the streambank and provide in-stream habitat while preventing future erosion.

  • BLUE CREEK STREAM RESTORATION, TOLEDO, OH
    BLUE CREEK STREAM RESTORATION, TOLEDO, OH

    DRG restored a 4,018-foot segment of the Blue Creek Stream in Toledo, OH after an assessment found the area to be eroded, nutrient loaded, and unable to sustain aquatic wildlife.

  • MITIGATION BANK RESTORATION, LAKE STATION, IN
    MITIGATION BANK RESTORATION, LAKE STATION, IN

    DRG provided invasive species management and control for the 230-acre Lake Station Mitigation Bank,bringing the area back into compliance with state and federal regulations.

  • RESIDENTIAL PLANNING & LAND DEVELOPMENT, COPLEY, OH
    RESIDENTIAL PLANNING & LAND DEVELOPMENT, COPLEY, OH

    DRG completed site planning, roadway design, water line tie-ins, stormwater management, and storm and sanitary collection systems for the Redwood Apartment Neighborhood in Copley, OH with minimal disruptions to the preserved and protected natural areas on-site.